Congratulations to Renew Energy on their new diagnostic testing slab for windmill gearboxes. The footing is 18’ x 55’ x 10’ deep with 3’ of controlled fill place back, 7’ of concrete, (96) 3’ x 1” anchor bolts, and 4 tons of rebar and steel beams. This project went extremely well with the efforts of all involved. Thank you, Renew Energy, for letting us be a part of your project.